Opens in a new tab
Skip to main content

🥋 Free for students & open source. Become a founding member →

Use the belt curriculum

Use the built-in belt requirements as a shared standard for what each stripe takes, and point students to programs that cover it.

For academy owners Academy Owner In the app: Menu › Academy Management › Curriculum Updated Sep 2026

Overview #

Curriculum has two parts: Belt Requirements, with key topics and stripe requirements for white, blue and purple belt, and Active Programs, which links to lessons in the program library.

Belt requirements #

Key topics by belt

White Belt
Postures & base · Basic escapes (mount, side control) · Closed guard fundamentals · Hip escapes (shrimping) · Basic submissions (armbar, triangle, RNC)
Blue Belt
Guard retention system · Passing fundamentals (pressure + speed) · Takedowns (double leg, single leg) · Half guard top & bottom · Submission chains
Purple Belt
Advanced guard systems · Leg locks (heel hooks, knee bars) · Competition strategy · Teaching fundamentals · Flow and transitions
Stripe requirements by belt
Belt1st stripe2nd stripe3rd stripe4th stripe
White Belt20 classes40 classes60 classes80+ classes + assessment
Blue Belt100+ classes150+ classes200+ classes250+ classes + competition
Purple Belt350+ classes400+ classes450+ classes500+ classes + teaching

Tip: compare a student's session count on their client profile with this table before you approve a stripe on Assessments.

Active programs #

Active Programs lists six programs from the library, each with modules and duration. Tap one to open it. Students see the same programs under Programs, where the first three lessons are free and the rest need PRO. More in Programs & lessons.

Limits and what's coming #

  • The curriculum is a built-in reference. You can't edit topics or requirements yet.
  • Brown and black belt requirements aren't listed.
  • Requirements aren't checked automatically. Promotions are always your call.

Coming soon: building your own curriculum and programs. The Create New Program button isn't active yet. Follow progress on the public roadmap.